• Survey the area & mark the pile points.
• Bring the rig near pile point, Align tip of Auger with pile point using articulation & adjust vertically
• Pre-bore @ 1m depth, place guide casing keeping pile point at centre & press by rotary. In case of longer casing it is placed in a similar way.
• Start boring depending upon the material being bored, Drill & take out musk. After boring to the desired depth, clean the bore by using bucket.
• After the boring is finished, lower the cage in the bore using a crane or auxiliary winch of the rig. Pour the concrete using tremie pipe up to the top of the bore.
• Remove the temporary casing by crane/2nd winch.
Dia : 450 to 2500 MM
Type of Pile : 1. Driven pile foundations, 2. Cast-in-situ pile foundations
3. Combined pile foundations, 4 End-bearing piles, 5 Screwed piles, 6 Steel piles, 7 Concrete piles, 8 Stone Column (Aggregate piles)
Piling Machine We Use : hydraulic MAIT Machine, DMC Tripod Conventional Method direct mud circulation, Tyre mounted rig machine( Tractor, Truck), Manual Auger Machine,
Expertise : Piling in Rock, Piling with liner,Piling in sand Gravels, Piling in River, Offshore piles
PRICE : Rs Negotiable
CONTACT NO FOR PILING SERVICES : Call/ Whats up-+91 74892 84608 /+91 62327 26290
email ID: [email protected]
Address:
Registered Office: Tiara Infrastructure Pvt Limited Address: Saikripa square, Tiara House 782, Service Road, Yojna, Scheme No 171, Indore, Madhya Pradesh 452010